top of page
The Causeway
The construction of two retail units at Great Billing. This project of two units involves driven steel piles for the buildings foundation and sheet piling to the edge of the adjacent lake. The surrounding carparks are constructed from grid system to comply with the specified planning conditions.
In Construction
The following images were taken during the construction phase of the project
bottom of page